Dredging New Zealand with the help of McCallums motorized barge “Kapua” delivered 2440m3 large and small rock. Dredging New Zealand lifted the height of the Hobsonville breakwater between, 1-1.4metres high, using Dredging New Zealand’s two Longreach spud mounted diggers. This contract was completed in three weeks. (In our Clients words very pleasing).